Renewables

Serbia reaches 500 MW quota for wind power

Published

April 27, 2016

Country

Comments

comments icon

0

Share

Published:

April 27, 2016

Country:

Comments:

comments icon

0

Share

The Ministry of Mining and Energy revealed in mid-April it filled the capacity of 500 MW envisaged for electricity from wind turbines. Projects awarded with the temporary status of privileged producers are eligible for subsidies by law, but the government yet needs to adopt the frame for power purchase agreements. Serbia is waiting for a new cabinet to be formed after a general election was held on April 24. Investors have been showing interest in more projects.

The quota includes projects Čibuk 1 by Vetroelektrane Balkana d.o.o. (Continental Winds) of 158.4 MW, Kovačica by Elektrawinds K-Wind d.o.o. of 105.6 MW, and Plandište 1 by Wind park Plandište d.o.o. of 102 MW. The last one is controlled by NIS, Serbia’s flagship oil and gas company, majority owned by Russian Gazprom Neft.

Company Elicio had facilities Alibunar and Malibunar of 42 MW and 8 MW, respectively, accepted within the designated volume through firms Electrawinds-S d.o.o. and Electrawinds Mali WF d.o.o. Three projects managed by venture MK-Fintel Wind a. d. in the list are Košava, with 68 MW, La Piccolina, 6.6 MW, and Kula, the only operational wind farm, of 9.9 MW. However, only 22.6 MW of Košava was included in the quota, while Ram, facility planned for 9 MW, was rejected.

Elicio said it was the first to provide banking guarantee for a large project, Alibunar, and was granted the status of a privileged producer of power. The fact that the 500 MW quota is reached shows that investors in renewables have confidence in Serbia and that it is about time to issue directives regulating the sector so that construction can begin, the company underscored in a statement for Balkan Green Energy News.

“We are very proud that wind park Kovačica, as one of the newest projects, was included in the 500 MW quota, together with the most serious investors, who from the beginning showed dedication in their work and intentions to build,” said Miloš Colić, head of New Energy Solutions d.o.o. (NES), developer of the facility.

Related Articles

belgrade energy forum bef 2025 western balkans region cooperation

BEF 2025: Regional cooperation can facilitate energy transition, energy security

22 May 2025 - Belgrade Energy Forum featured representatives from the governments of Montenegro, Croatia, Hungary, the Republic of Srpska, and Serbia, and from UNECE

new york equinor empire wind

Equinor resumes New York offshore wind project of 810 MW after stop-work order lifted

21 May 2025 - The project's first phase, the 810 MW Empire Wind 1, is expected to generate electricity for some 500,000 homes in New York

eu renewable green hydrogen subsidies

EU awards nearly EUR 1 billion in subsidies to renewable hydrogen projects

21 May 2025 - The subsidies for renewable hydrogen were awarded via the second auction organized by the European Hydrogen Bank (EHB)

Romania commission offshore wind study 3 GW 2035

Romania to commission offshore wind study, targeting 3 GW by 2035

21 May 2025 - Romania is receiving expressions of interest for a study identifying areas in the Black Sea for concessions for offshore wind farms

OSZAR »